Use
- Use appropriate sand, gravel, and water.
- Mix with the least amount of water possible to obtain the desired slump.
- Use the best mixing method for obtaining a uniform concrete.
- Place and compact the concrete as best as possible.
- Cure for at least 7 days keeping the surface of the concrete moist and protected from extreme temperatures.
Handling bulk cement
- Store the cement in silos, making sure they are covered and that there are no residues of other products.
- If it is not stored in silos, keep the cement protected from humidity, place it in clean surfaces or containers.
BIG BAG
With a weight from 1.5 to 2 tons, it is ideal for transformers that use it for pre-manufactured elements; as well as works requiring rapid resistance.
Special equipment for its handling is required, such as forklifts or if applicable loader backhoes or hiab with enough capacity.